Looking for a forestry road building contractor on Vancouver Island? Illaheechuck builds forestry, mining, and resource access roads across the Island and Northern BC: clearing, subgrade, rock work, surfacing, drainage, and stream crossings, self-performed by our own crews.
Nothing happens in the bush until there's a road in. Timber doesn't move, drills don't turn, crews don't get to site, and nobody hauls anything out. Illaheechuck Civil Construction builds those roads: forestry roads, mine and exploration access, utility corridors, and remote development access, across Vancouver Island, Northern BC, and Yukon.
We're a First Nations owned heavy civil contractor, and resource road construction is core work for us: we self-perform it end to end with our own operators, our own equipment, and layout and grade control handled in-house. Here's what we build, and how.
What we build
Right-of-way clearing and grubbing. We fall and clear the road prism, remove stumps and organics that would otherwise rot out under the running surface, and manage debris and merchantable timber as part of the plan, not as a surprise after the fact.
Subgrade and earthworks. Cut and fill through terrain that rarely cooperates. On the Island that means side-hill construction: benching into slope, balancing cut against fill, and building a stable prism where there wasn't one. Our machine-control models and in-house grade crews keep the alignment and grades to the design.
Rock work. Island ground turns to rock fast. We handle rock excavation and build with shot rock, and we coordinate drilling and blasting so a rock section is a planned scope, not a crisis.
Surfacing. Pit-run and crushed granular, placed and compacted to carry loaded logging trucks and lowbeds through wet weather, not just in August.
Drainage. Ditching, cross-drain culverts, water bars, and grades that move water off the road before it takes the road with it. On a coastal resource road this is most of the job, and we build it that way.
Stream crossings. Culverts and crossing structures installed to fish-passage and fisheries requirements, inside the timing windows regulators set, with erosion and sediment control in place before the first bucket goes in the water.
Maintenance and deactivation. We grade, re-ditch, and repair surfacing on active roads, and we deactivate roads at end of life: pulling crossings, restoring drainage, and stabilizing the prism.
How we build on the coast
Rain is our design case. A road built for dry conditions fails in November. We size culverts, cut ditches, and place surfacing for what a Vancouver Island winter actually delivers, because washouts, sediment in streams, and emergency repairs are far more expensive than building it right the first time.
We plan for water and fish. Resource roads cross fish-bearing streams and drain into watersheds communities depend on. Erosion and sediment control, instream timing windows, and proper crossing structures are built into our schedule and our pricing, and we work alongside environmental monitors and qualified professionals rather than around them.
We operate self-sufficiently. Fuel, maintenance, spares, and supervision that can make decisions far from town. Bush jobs punish contractors who can't run independently; our crews are set up for it.
We build to the design. With layout and grade control in-house, the road gets built to the alignment and grades on the drawings, quantities are tracked honestly, and as-builts close out clean, which matters when a licensee, a mine, or a regulator asks what was actually constructed.
Who we build for
Forestry licensees and contractors building and maintaining haul roads into cutblocks. Mining and exploration companies needing access and haul roads to remote sites. Utilities and developers opening corridors and remote sites. First Nations and their development corporations building access on their own territories.
As an Indigenous-owned contractor working in the territories our people come from, we also help licensees and proponents meet the Indigenous participation commitments that increasingly come with resource work, with real scope delivered by real crews, not a name on a page.
Get a road built